Contractor : KOLİN-KALYON YARIMCA PORT CONSTRUCTION JOINT VENTURE TRADE OPERATIONS
Subcontractor : LCM ROTA CONSTRUCTION AND MARITIME TRADE LTD. CO.
Within the scope of the project, 906,230 m³ of seabed dredging and dumping work was carried out.
The quay fronts and port basin and maneuvering areas were dredged to -12.00 meters elevation.